Building
Water Barrier Wall
Carpenter
Plan Water Barrier Wall as a structural water-control component with its own craft cost.
Carpenter1 supported recipe route
WHY CONSIDER IT
The acquired source recipe records 1 × Water Barrier Wall from 10 × Shell Limestone, 2 × Gold Barsat Carpenter (source category: Carpenter). This makes its material cost traceable in the captured graph.
When it fits: When including water-control structures in a build.
The tradeoff: The recorded inputs are 10 × Shell Limestone, 2 × Gold Bars; station: Carpenter. Check the source conditions before treating this as universally available.
Planner recipes & alternatives
Material calculator: 1.0 source snapshot.
Used by 0 objects
No downstream uses are recorded in this source scope.