Power distribution
Power Pole (Level 2)
Tier 3
Plan factory materials and assembly capacity for Power Pole (Level 2).
Tier 31 supported recipe route
WHY CONSIDER IT
Power Pole (Level 2) adds power distribution capacity to a factory. The captured route costs 9 × Iron Plate, 15 × Heatsink at Assembler (Level 2); use this when planning production flow or infrastructure needs.
When it fits: When choosing or budgeting a power distribution recipe in Little Rocket Lab; no unlock timing is inferred.
The tradeoff: Captured source route: 9 × Iron Plate, 15 × Heatsink; station: Assembler (Level 2). Other routes or progression availability are not claimed.
Properties & access
Sell Price
TypeBuilding
Size1
Power
Planner recipes & alternatives
Material calculator: Wiki revision snapshot 66a855535334.
Access & prerequisites
- Source tier 3
Used by 0 objects
No downstream uses are recorded in this source scope.