Power generation
Biomass Burner
Power generation
30 MW power generation.
Power generationAcquisition / use reference
Source-recorded costs & routes
Satisfactory 1.2.4.1 · These costs retain their source build. The pinned planner below has its own version.
Acquisition and use reference
This object has no supported batch recipe in the selected material library. Inspect its source, unlocks and related uses; it is not presented as directly craftable.
Used by 0 objects
No downstream uses are recorded in this source scope.