Project Assembly phase 1: Distribution Platform
A Project Assembly delivery target for the first phase.
Project parts are goal quantities rather than ordinary factory stock; plan the delivery batch as a discrete project and keep production output separate.
When it fits: Add it when Phase 1 is the active objective and confirm the current phase requirement.
The tradeoff: One source recipe run makes 1 and lists 50 Smart Plating at Space Elevator; 1 recipe variant(s) for this output are grouped together. Verify access where the pack is incomplete. The shipped quantity is not the full ongoing factory demand; logistics and any current phase changes require release-specific verification.
Planner recipes & alternatives
Material calculator: Satisfactory 1.2 · FactorioLab snapshot.
Access & prerequisites
- Unlock availability is not modeled; check the selected game build.
Used by 0 objects
No downstream uses are recorded in this source scope.