Medium Memetic Algorithm Bank II
Manufacturing
Medium Memetic Algorithm Bank II
1 per batch · Manufacturing facility
Recipe route: Medium Memetic Algorithm Bank II
How to make Medium Memetic Algorithm Bank II
- Gather the ingredients
For one batch, gather 5 Artificial Neural Network, 6 Power Circuit, 1 R.A.M.- Electronics, 3 Conductive Thermoplastic.
- Use the required station
Use Manufacturing facility.
- Make the output
Run one recipe batch to produce 1 Medium Memetic Algorithm Bank II. The recorded craft time is 30,000 seconds per batch. Check the prerequisites and source version below.
Recipe & ingredients
Source craft duration: 8.3 hours per batch.
Prerequisites and conditions
- ME 0 · base materials
- Blueprint and skills required
Blueprint skill requirements
- Industry · level 5
- Electromagnetic Physics · level 1
- Electronic Engineering · level 1
- Jury Rigging · level 1