Standup M-Set Invention Cost Optimization I
Manufacturing
Standup M-Set Invention Cost Optimization I
1 per batch · Manufacturing facility
Recipe route: Standup M-Set Invention Cost Optimization I
How to make Standup M-Set Invention Cost Optimization I
- Gather the ingredients
For one batch, gather 320 Burned Logic Circuit, 1,600 Fried Interface Circuit, 1,600 Melted Capacitor Console, 3,200 Scorched Telemetry Processor, 3,200 Defective Current Pump, 3,200 Smashed Trigger Unit, 3,200 Broken Drone Transceiver, 3,200 Damaged Artificial Neural Network, 3,200 Charred Micro Circuit, 3,200 Thruster Console.
- Use the required station
Use Manufacturing facility.
- Make the output
Run one recipe batch to produce 1 Standup M-Set Invention Cost Optimization I. The recorded craft time is 3,000 seconds per batch. Check the prerequisites and source version below.
Recipe & ingredients
Source craft duration: 50 min per batch.
Prerequisites and conditions
- ME 0 · base materials
- Blueprint and skills required
Blueprint skill requirements
- Industry · level 1